Customization: | Available |
---|---|
Media: | Water |
Temperature: | -40ºC~+120ºC |
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
This 2-Way Brass Pilot Solenoid Valve is designed for precise control of air and water, utilizing magnetic pulse technology. Constructed from high-quality brass, this valve ensures durability and reliability. Its compact design and efficient performance make it an ideal choice for a wide range of industrial and commercial applications.
This 2-Way Brass Pilot Solenoid Valve, with its high performance and versatility, is widely used across various industries, making it an ideal choice in the field of fluid control.
Optimization of the APQP (Advanced Product Quality Planning) management phases and components:
Specification: Define the technical specifications and performance requirements of the product.
Application: Understand where and how the product will be used.
Special Requests: Any specific standards or requirements from the customer.
Delivery Requirements: Timeframe, location, and method of delivery.
Design Group: Form a specialized design team.
Produce Assessment: Evaluate the feasibility of producing the product.
Time Assessment: Evaluate the project timeline and delivery schedule.
Cost Assessment: Assess the project's costs and budget.
DFMEA (Design Failure Mode and Effects Analysis)
Model Design
Model Analysis
Design Completed
Incoming Material
Mould Design
PFMEA (Process Failure Mode and Effects Analysis)
Mass Production Assessment
MSA (Measurement System Analysis)
PPAP (Production Part Approval Process)
Cross-Functional Team Collaboration: Ensure effective communication and collaboration between design, production, procurement, and quality teams.
Continuous Improvement: Regularly review and update the APQP plan to reflect project progress and customer feedback.
Data-Driven Decision Making: Utilize data analytics tools and techniques to support decision-making, improving product quality and production efficiency.
Final Target: Customer Satisfaction
PPAP Submission
2D Measuring Projector Hardness Tester Salt spray tester
Material spectrometer Electroplated coating thickness tester CCD automatic detector
Made in China site certified factory. |
Factory passed ISO 9001:2015 and IATF 16949:16949 international certification. |
Products passed RoSH and REACH testing, product environmental control. |
Product raw materials are tested by the quality department and third party testing components. |
Q: Who we are?
A: Professional manufacturer specialized in metal parts which over 20 years of rich experience.